Saturday, 31 December 2011

Bukalong Stockyards

Because of its distance from anything else most of the infrastructure of the Bombala line beyond Cooma survives today. Among the items left are the stockyards at Bukalong.
Bukalong is located at 519.524km and is the last station before the terminus at Bombala, a further 15 kilometres down the line. The station opened with the line on 21 November 1921 and closed as a station on 20 February 1975, one of the many stations in New South Wales that closed in 1975. The siding was offically closed on 23 November 1982 but more than likely saw little use post-1970. A PC1 type station building was provided on a 77 metre long platform.
A loop siding 349.5 metres long on the up side of the line was provided at opening. A down facing crossover approximately halfway down the loop was also provided - this was removed some years prior to the line's closure. The line closed on 26 March 1986.
In the later years of the line (1978 Timetable) the only train was No. 411 Conditional Freight that was tabled to run on Wednesday's and Friday's and was conditional on Tuesday's and Thursday's. The train departed Cooma at 7:30am (after the arrival of the overnight mail from Sydney) and arrived at Bombala at 11:20am. The return service departed Bombala at 1:30pm, arriving back at Cooma at 5:46pm.
The stockyards are located on the loop 331 feet from the up end points. The stockyard platform was 148 feet long.
The stockyards are predominately constructed of timber and protected from the elements by red lead paint - alot of which still survives.
The below picutres were taken in May 2012.














































Tuesday, 13 December 2011

Chakola Bridge

The southern most 'big' bridge on the Cooma - Bombala line is over the Numerella River at Chakola. Located at 415.658km it is one of the longer timber railway bridges in New South Wales. Among those that are longer are the Murumbidgee River bridges at Gundagai and Narrandera but not much else. Made up of 47 spans of various lengths the bridge totals 390.1 metres (1280 feet) in length. To HO scale that translates to 4.5metres or 14'8" in the old money - while long, the bridge is just doable to scale on (say) two 8 foot modules - but thats for another day.

The bridge is made up of (from the northern (or Up) end):
  • one 15 foot trestle span
  • 21 x 26 foot trestle spans
  • 5 x 42 foot Howe Trusses
  • 19 x 26 foot trestle spans
  • one 15 foot trestle span
 When constructed in 1889 the whole bridge was a ballast top type but by the 1960s the main spans were beginning to show their age and work was undertaken to convert the main spans to a transom top. In 1978 further work occured on the main spans when steel RSJ's were added underneath the main Howe trusses.

The bridge suffered 'flood damage' in 1989 which ultimately closed the line. While this was the 'excuse' that was used some weeks after it was 'closed' 5910/train/1210 ran over the bridge to join the 100 year celebrations of the opening of the line at Cooma.

With no maintenance since the late 1980s the bridge, at over 120 years old, is beginning to show it's age and at least one pier on the southern approach trestle has sunk and there are numberous holes in the ballast top apporach trestles. Usually the river runs so low you can actually walk across (at times without getting your feet wet) - time will tell but the next big flood to come down the Numerella River could wash away parts of the bridge.

The main Howe Truss spans from the Down side of the line -
note the steel RSJ's underneath.
A view along the main span from the Southern (Down) end.
Detail of the end of the ballast top trestle and the main spans at the
southern end.
More detail of the end of the Howe trusses. Note the marking
indicating the fatigue in the timber - these are all over the bridge
Detail of the truss of the southern most span
More detail showing the tension rods.
The inner end of one of the trusses.
A view of the end of the truss at the top.
The inner end of the truss showing how the ' handrails' are attached.

The ' handrails' between the Howe trusses - these are not load bearing.
Looking south from the main spans showing the section
of the southern approach span where one of the piers
has sunk
Looking north showing four of the five main spans.
Detail of the main spans showing the transom top conversion.
Another shot of the end of the truss.
Detail of the bottom of one of the trusses showing the tension rod.
The top of the truss showing the saddle for the tension rod.
Detail of the truss
Detail of the truss showing the transom top.
The southern approach trusses - note the 416km post.
The southern approach trusses looking north showing the 'sunk' piers.
Another shot of the sunk pier.
View of the end of the southern trestle and the start of the main trusses -
the concrete base of the pier is a much later addition.


The underside of the main spans showing the additional RSJ's.
One of the piers of the main spans  - note the adidtional
timber to support the RSJ's
The underside of the Howe Trusses.

The piers of the mian spans - note the additioanl timber to support the RSJ's
The top of the piers - and the addition RSJ supports.

Monday, 17 October 2011

Bredbo Bridge

Been a while since the last posting (been on holidays)..........

The line from Queanbeyan to Bombala still has a wealth of infrastructure that has not been removed by the razor gangs even though the line closed 25 years ago. The bonus is that the Cooma station and yard has everything that was there in 1965 (although the water tank is a ring-in relocated from Yannergee).
Among the items on the line are the three large timber trestles over Ingelara Creek, Bredbo River and Numerella River. All three are readily accessable if you are prepared to do a bit of walking (although check with the land owner first).
This post (there will be other posts on the infrastructure of this line) will concentrate on the 1889 built Bredbo River Bridge located at 412.616km, just under two kilometres south of Bredbo station. The bridge has ten 40 foot timber ballast topped Howe truss spans with brick abutments. Unique is the 30 degree skew of the timber piers, skewed to the flow of the river.
I have all the timber and bolts required to build an HO scale model of this bridge - stay tuned. 

The bridge viewed from the down side looking in the down direction.


Along the bridge from the up end in the down direction.

Looking in the up direction - note the scouring of the
ballast due to the failure of the timber decking in
recent years.


A view looking down showing the only
major items of steel in the whole structure.

A view of two of the spans

Detail view of the span.

A view of the abutment from underneath - note the red lead
paint on the timbers - virtually everything the NSWGR did
in timber was painted with the red lead to protect it.

A side on detail view of one of the spans.

A view of one of the timber piers - they are much wider than
normal piers due to the skew - of interest is that the piers on 
the original plan are brick (similar to the brick sections of the 
piers of the Ingelara Creek bridge to the north).

A view from the downstream (or up side) of the bridge looking
in the down direction - the skewed piers can clearly be seen

A view showing the upper section of one of the spans.

The brick abutment.


A view underneath of the abutment.