Saturday, 10 March 2012

NSWR Water Facilites Part 2 - 1855 to 1892

This is what can be regarded as the first period of railway construction in New South Wales. In the 25 years, the lines from Sydney to Gerogery (and a year later Albury) in the south, Wellington in the west with a branch to Richmond and from Newcastle to Tamworth with a branch from Werris Creek to Gunnedah. With the exception of some station buildings the majority of the infrastructure built during this period has either been replaced by more modern examples or removed altogether. Unfortunately no water tanks from the period survive today and there is very little information available of the watering facilities infrastructure of the period. What can be deduced is that initially there were many different types of tank and stand - Whitton was no doubt establishing the best way to construct infrastructure with the limited funds that were being made available to him.
The first five engines of the New South Wales Government Railways were classified the 1 Class and with tenders that had a water capacity of only 2000 gallons the one tank at Sydney Terminal could have successfully filled all five tenders and still have remained half full. It was not until the arrival of the L(304) class, (renumbered to the (Z)21 Class in the 1924 renumbering) in March 1885 that saw the capacity of the locomotives tender rise to 3000 gallons (13,650 litres) and it was not until 1891 with the arrival of the J(483) Class (Z 29 Class in 1924) and the P(6) in 1892 that saw tender capacity rise over 3000 gallons. As a result of the small tenders the size of water tanks were limited as there was not a great requirement - even the water tank at the first Lithgow Loco Depot only had a capacity of 9000 gallons although this was in addition to a tank supplying Lithgow Coal Stage.

The tanks built during this period can be divided into two main types:
1. A plate type which were made from both iron and steel, the centre of which buckled outwards to provide rigidity. The bulge is square and protrudes approximately 3” (7.5 cm). Adjoining panels are fastened to a flat bar positioned behind the join, resulting in paired vertical rows of bolts on the exterior of the tank. Angle was used to join the corners and brace the top edge of the tank. This tank is known as Type One.

An example of a Type 1 tank with buckled plates, this one at
Koorawatha on 15 November 1993. This tank and stand have
subsequently been dismantled and re-erected at Gundagai.

2. A square cornered cast tank which had panels that were flat on the outside. This type was characterised by rows of bolts along the bottom edge and down one side of the tank. Adjoining panels are bolted together through flanges on the inside edge of each panel. The bolts only passing through the panels on each corner. This tank is known as Type Two.


A Type Two tank at Tallong on 29 July 1994

 Both these types of tank had numerous shortcomings - the capacity of the tank could not be increased if required, there were three different types of panels required for each tank and repair of the tank if required was difficult - this was shown many years later in 1946 when a tank of this type at Grenfell failed and it was replaced rather than repaired.
From the very beginning it was established that the vertical sides of the tanks could not withstand the weight of the water on their own and that bracing was required. This also took two forms - that of bracing from the floor of the tank to the sides using iron bars and by using steel rods connecting the upper edge of the sides. The weight of the rods across the top would have pulled the sides inwards when the tank was empty, this was avoided by using timber to support the bars in the middle of the tank.
The interior of the Type 1 tank at Koorawatha.
Note bracing from the floor of the tank to the sides
and additional bracing across the top of the tank.

The interior of a Type 2 tank at Swan Ponds - note the bracing
from the floor of the tank to the sides. 1994.


The interior of the Type 2  tank at Tallong previously shown. Note bracing from floor to side of tank and bracing across the top with timber support. Note also the different method of attachment for he bracing across the top when compared to the Koorawatha tank. The railway line is in the upper left background. 29 July 1994.
 The construction of the stands varied greatly with wood, brick and stone being used. The tank at Sydney was supported by part of the workshops which was made of stone while the tank at Duck River, although no plans exist would probably been constructed with timber. When the line was extended in 1856 to Liverpool, a third watering facility was constructed , using a brick structure as the stand. Thus in the first three watering facilities built there were three different types of construction.
The tank at Liverpool which was a Type 2 structure was supplied from the Georges River which runs beside Liverpool station, had an attached jib which had two valves between the tank and the outlet. The first valve which was controlled from ground level was a simple pull down to flow affair, releasing when the desired amount of water had been delivered. There was an additional screw valve on the jib to allow operation from the tender of the locomotive. Additionally there was a screw valve on the end of the jib.
Initial construction proved that Sydney Terminal and Liverpool were the exception to the rule during this period with the majority of stands being of wood construction.
Plan showing location of Jib on tank at Liverpool.
Note brick construction of walls supporting tank
and that the tank is only supported by the exterior walls.
Note also dual valve arrangement as mentioned above.




Detail of jib valve arrangement on the tank at Liverpool.


By the end of 1870 the railways had reached Aberdeen (from Newcastle) in the north, Rydal in the west and Goulburn in the south. In extending from the meagre beginnings of 1855 - 56 two further tank types were used, both of sunk into the earth. At Blacktown in a drawing dated 31st July 1860 (some four weeks before the line from Parramatta (Granville) was opened), subterranean tank is shown. This tank sunk some nine feet (2.75 metres) into the ground was constructed of brick using the ‘ best Portland Cement. The base of the tank had two separate floors with the plan detailing the requirements: “The first floor to be laid to a proper template, cut to form invert and well grouted in liquid cement. The second floor to have every brick thoroughly bedded and jointed and well flushed all round in the best Portland Cement, mixed in such proportions as the Engineer may direct. Turn the arch covering part09” & part 14” thick in like cement and in like manner properly cut to form Skewbacks and solid form. A 2 feet square manhole in the centre of the arch, build in sides of same two 3’6” iron bars each 2.5 x .5 iron” The tank was some 10 feet (3 metres) wide by 20 feet (6 metres) long. The roof was supported by four internal columns. It is not known how this tank was supplied.
The plan refers twice to construction being down as the Engineer directs. This is probably the first of many occasions where there was a plan of the structure but it was adjusted on site to suit local conditions. In later years this was especially prevalent.
Section through the tank at Blacktown. Extract from plan dated 31 July 1860

The main south line was the first line to reach the ultimate goal of the state border at Albury in 1881, thus providing the through connection to Albury and slowing down the drain of freight traffic to Victoria. With this in mind the majority of this section will concentrate on the watering facilities on the main south. During this period the Main West reached Wellington and the main north reached Tamworth and the development of watering facilities on these lines is mirrored by those on the main south.
The southern line was extended from Liverpool to Campbelltown in 1858, from Campbelltown to North Menangle in 1862 and to Picton in 1863. The extension from North Menangle to Picton required the crossing of the Nepean River just south of North Menangle and the opportunity was made to construct a tank with a jib on the actual bridge approaches., the water being pumped from the river. Trains would actually stop on the bridge so the locos could be watered. This tank was similar to the tank at Liverpool although it was built on a timber stand.
When the southern line was extended from Picton in 1867 heavy grades were required to climb the Southern Highlands and the locos of the time did not have the water capacity to haul a train from Menangle to Mittagong without replenishing their tenders. (Evidence suggests that neither Picton nor Mittagong had watering facilities at the time of opening.) The only reliable water supply between the two points was the Picton Lakes some 37 chains (750 metres) to the west and 160 feet (48.75 metres) below the line at its closest point. This location was located at 59 miles 58 chains (97.9 km) from Sydney Station (and six miles (9.84 km)from Picton) and was called Picton Lagoons Tank, subsequently renamed to Couridjah.
This was the first location where the water supply was some distance from the line and as such required a pumphouse, extensive piping and a tank. Although the tanks built since Blacktown (Menangle for example) were built on a stand the lie of the land at this location was used to advantage. Between the pumphouse and the line the land rose to some 8 feet (2.5 metres) above the top of the water column beside the track. At the top of the ridge two rectangular concrete tanks 150’ x 6” x 6’which were interconnected and were 9’ apart. The water flowed into the top of the tanks at the western end. At the eastern end a 9” suction pipe led from each tank , joining at a ‘Y’ piece and then travelled 263 yards via a 12” pipe before a the pipe size was reduced to 9” via a reducing valve located 75’ from the Down end of the station on the eastern side of the line. This 9” main directed water to the column. In addition to the 12” pipe from the tanks there was a 9” diameter pipe from each tank that join at a centrally located valve - this was used to drain the tanks if required.
In late 1867 the line was extended from Mittagong to Sutton Forest (subsequently renamed to Moss Vale) . In this section another watering facility was constructed where the line crossed over the Wingecarribee River the railway subsequently naming it Wingecarribee Tank. This tank and stand was of a similar construction to structure at Menangle although it was not attached to the bridge over the watercourse, it being located shortly to the south. With the opening of water facilities at Mittagong in 1880, Bong Bong (between Wingecarribee Tank and Moss Vale) in 1889. The need for the tank at Wingecarribee was diminished. Subsequently the facilities at Bong Bong were moved to Moss Vale in 1894 and the Wingecarribee Tank was removed in February 1895.
Up unto 1868 the majority of facilities constructed across the state were fully self contained in that they had jibs attached and they were immediately adjacent to the tracks. With the opening of the line from Moss Vale to Marulan in August 1868 and the construction of watering facilities at Barbers Creek (subsequently renamed to Tallong) the trend moved to separating the tanks from the watering point and moving the tanks some distance away from the tracks. Tallong was also the first facility on that required the railways to build a substantial dam that was specifically on a water course. Previously the supply of water was readily available in Lakes (eg: Picton Lakes) or in rivers that did not require the construction of a dam eg: Liverpool, Duck River.
May 1869 saw the arrival of the line in Goulburn. For over five years afterwards the line was not extended and the largest loco depot so far was built on the line. With a ready supply of water available in the Mulwaree Ponds a pump house was built to lift the water from the river to the loco area. A tank supplying both an attached jib and separate column was located in the loco yard on the Down side to the north of the station.
During the five years that the main south line remained at Goulburn the west was extended from Mount Victoria to Kelso and the main north from Muswellbrook to Murrurundi. These extensions saw the construction of water facilities at Wallerwang and Locksley on the west and Murrurundi on the north. In all cases the structures built were a cast iron tank on a timber stand.
In November 1875 the southern line was extended to Gunning after its five year hiatus at Goulburn. July 1876 saw it extended to Binalong, March 1877 to Harden and in November 1877 to Cootamundra. During this two year period facilities were built at Mulwaree Ponds, Fish River, Yass Junction, Illalong Creek, Rocky Ponds and Cootamundra. All of these tanks were of the same construction a cast iron tank on a timber stand. The capacities varied though with Mulwaree Ponds being a 6 x 6 panel tank holding 20,000 gallons (91,000 litres). The tanks at Fish River and Yass being 6 x 4 panels holding 13,200 gallons (60,000litres).
In the period of late 1867 to early 1877 the main trunk lines were extended from Mittagong to Harden in the south, Penrith to Blayney in the west and from Singleton to Murrurundi in the north. All of the tanks were of the Type Two version while the stands were of the Type A1 version, the construction during the period being to the same basic design - only the size and therefore the capacity of the tank varied. None of these stands survive today although some of the tanks have been relocated onto newer constructed stands or the stand replaced in the same location.
The tanks were made up of two separate types of panels. The base of the tank was made from 4’4” (1.32m) square cast iron panels with 2” (5cm) flanges on all sides. The panels also had a strengthening cross on the inner sides. The exterior of the panels was smooth. The sides of the tank were made from similar panels except they were 4’4” wide by 5’ high (1.23m x 1.524m). The stands were constructed from timber, the piers being 12” (30cm) square. The inside piers were vertical while the outside piers were splayed at 5.5 degrees. 6” x9” timber was used to brace the all of the piers against each other piers. All of these tanks also had a swinging jib attached and as a result were located close to the line.
The original tank as constructed at Mulwaree Ponds. This tank was 26’ (6 panels) square.

The original tank as constructed at Mulwaree Ponds. The valve seat was rusted into the bottom of the tank. The swinging section of the jib was made of sheet copper while the plumbing was like the tank of cast iron. (from plan titled Great Southern Railway Extension Goulburn to Wagga Wagga Plan of Water Tank.)
Diagram of the type of stand built between 1867 to 1877. (from a diagram titled frame for water tank)

By 1876 Whitton had been using his first standard design for around ten years and the first development of the timber stand was conceived. The splayed legs were difficult to construct and maintain as precise measurements of the angle were required. They also required additional bracing which negated the use of the shelter provided by the elevated tank. The opening of the southern line from Cootamundra to Bethungra in April 1878 and the construction of a 20,000 gallon tank at the terminus saw a change to the design of the stand. A drawing of the tank at Bethungra signed by Whitton on. 20th April 1877 saw changes to the stand. The splayed outside piers were replaced by vertical ones and bracing was only done to the outside piers and then only to the piers adjacent to the corners. The space under the tank was partially enclosed and a store created. The store had two windows on the sides and a door facing the track. This type of stand was built in the majority of cases through to 1892.
The foundations for this type of stand consisted four lines of bricks 27’9” long laid with centrelines 8’3” apart. The ends of the lines being join from front to back. The bricks, laid to approximately 12” above ground level, were2’3” wide although the final course was only 18” wide. At each pier the foundations widened another 9” to spread the load. The sides  The number of courses depended on the state of the ground and was up to the discretion of the engineer on site. Laid directly on to the brick were 12” wide by 6” high timbers. Sixteen 12” square piers 13’ high were placed onto the timbers and were braced by12” x 6” timbers. Across the top of each set of four piers was laid 12” square timbers from front to rear topped by another seven 12” square timbers that were placed at right angles. The tank was then placed on the top.
The period between 1877 and 1893 was on of major expansion for the railways. The southern line reached it terminus at Albury, the northern line at Wallangarra, the western line at Bourke and branchlines from Goulburn to Cooma, from Junee to Hay, from Wallerawang to Mudgee and the cross country line between Harden and Blayney. With the exception of Albury every stand built during this period was the same as the stand at Bethungra. The tank and stand at Albury, built in 1880, was the largest tank to date, its capacity being 27,000 gallons (122850 litres). The structure at Albury was one of impressive quality, the tank at Liverpool back in 1856 being the only structure that was similar. A brick structure was no doubt built to match the station buildings that were constructed at this the terminus on the state border with Victoria. Of interest the other end of the state on the main north at Wallangarra saw a single column on a single stand. It is obvious from this that the emphasis on the construction and style was with the main south rather than the north. The stand and tank at Albury survived until the late 1930’s when it was replaced by a standard 20,000 gallon tank on a standard timber stand.
An example of the foundations used in the majority of stand constructed between 1877 and 1892.This is the remains of the structure at Gundagai, located at the Down end of the platform. A swinging jib was attached to the tank. 7 November 1998.


Detail showing a stand constructed in the 1877 to 1893 period. This stand is at Swan Ponds between Blayney and Cowra. Note the bracing on the outside piers and the point were the bracing crosses. 17 June 1992.

The stand and tank at Swan Ponds with swinging jib. This is an example of the structure built in the 1877 to 1892 period. It is believed that this structure was originally built at Nargong some three kilometres away in 1888 and moved to this location in 1905 as a more reliable water source was found. The tank was constructed by Albion Engine Works of Pyrmont in Sydney in 1888. This was one of a series of tanks built by this firm for the Cowra line. Two other tanks on modified stands are at Cowra Loco Depot.
The 27,000 gallon tank at Albury was constructed by Atlas Engine Works and was eight plates by six plates, with each plate being 4’4” wide by five feet high. The tank was located on the stand at a height of 13’6” which was the height of most tanks above the ground at the time. While the stand was built by the contractor constructing the line, the tank and associated plumbing was a separate contract.

Plan of the structure built at Bethungra for the opening in 1877.
Showing the enclosed store. This tank was supplied with a
swinging jib which is not shown on this diagram suggesting
that it was a separate contract. It was the first of many
structures built to this plan.

The commanding edifice at Albury, the plan signed by Whitton
on 7 May 1880. While the exterior of the structure was brick,
the supports for the tank which were not seen from the outside
were the usual 12” square timber piers. The stand was 35’ long,
26’ wide and was 13’6” high.

Saturday, 3 March 2012

NSWR Water Facilities Part 1 - The Overview


The New South Wales Government Railways commenced service on 26th September 1855 with the opening of the line from Sydney Terminal to Parramatta (Granville). When the line was opened railways, as we know them today, had been in existence for only 30 years and construction methods and practices were still in their infancy, especially when it came to railways outside Europe and America.
The original site of Sydney Terminal was slightly south of the current location with the buffer stops being on the south side of what is now called the Devonshire St. subway, the subway replacing the road due to construction of the current Sydney Terminal. Within the confines of the terminal railway yard were all the facilities required for the successful operation of the fledging railway. These facilities included a stone two story machine shop on the eastern side of the yard. Above the engine room of the machine shop was a water tank capable of holding 20.000 gallons (91,000 litres) of water. Towards the western end of the line between the current day Auburn and Clyde a crossing of Duck River was required This was done on a bridge of two, ten foot (three metre) openings. The contract for this bridge which cost 1,774 pounds also included a weir on the southern or upstream side of the bridge to provide a locomotive water supply. A pump of an unknown type was used to lift the water to a tank (which, probably had a jib) that was built on the Parramatta side of the river. These were the first of two watering facilities that at their greatest extent in the 1950’s existed in over 450 separate locations. This equates to approximately a watering facilities at one in every three locations.
From these rather small beginnings the railways expanded in three distinct construction periods: from 1855 to 1880, 1880 to 1910 and 1910 to approximately 1930 totalling some 6,220 miles (10,010 kilometres) of constructed lines in 1965. By 1930 the railways had fundamentally completed the network and although some construction was performed after this date the railways moved in to the maintenance rather than construction phase. The development of the provision of watering facilities closely follows the same timings and although concentrating on particular items of railway infrastructure shows the continual development that occurred over the 80 or so years from 1855 to 1940.
During the first 50 years of the Railways existence the majority of the trunk lines were completed and in the following 20 years the cross country lines and branches were constructed. Initially water facilities were constructed where the water was available regardless of whether it was in a town or not. This led to infrastructure being constructed in what was in reality the middle of nowhere, the only prerequisite being that it was the location of reliable water. Examples of this are Couridjah, Fish River, Young Tank, Crowther. In later years a number of these locations were disbanded or moved to the nearest town. This is an example that the construction and operation of the railways was built around the economic concerns rather than concern for passenger convenience.
When cheaper means of supply became available the Railways were quick to lower costs and converting to the cheaper means of supply, be it moving the watering facility to another location in the section or converting the supply to the town water service.
Over the years water was hauled around the system in enormous quantities to provide reliable supplies. As an example at Ivanhoe the water was supplied by water carried in water gins from either Menindee or Euabalong West from when the line opened in 1925 until the demise of steam on the Broken Hill line in the 1960’s. In times of drought or due to the failure of a water supply facility the trains themselves ran with additional water carried in water gins attached to the engine.
Until 1974, (when the suspension of services began) the railways were a massive undertaking employing over 100,000 people in all duties. While steam was running a small portion of these people were involved in maintaining the watering facilities around the state. Once the infrastructure was complete it was the responsibility of the loco branch to provide continued water supplies to passing trains if required. They also would advise on any maintenance required. These people were designated as pumpers and may be responsible for maintaining the water levels in as many as three or four tanks at separate locations - As an example the pumper at Glenapp was responsible for the tanks at The Risk, Glenapp and Kaguru.
The official Railways terminology for these people was Loco water supply men and to allow them to carry out their duties they could travel by train between locations. This was detailed in the Local Appendix and was described as such:
Loco Water Supply men may be allowed to travel to Pumping Plants by Goods Trains from watering stations (or nearest station) for the purpose of effecting urgent repairs, or return from nearest station to pumping plant to home station.
The local Station Masters may give authority for the stoppage to be made on written application from the Loco Supply Men, and which documents must be immediately sent to the Local District Traffic Supervisor with report.
Initially a steam engine was used to provide power for the pump and coal had to be carted from the station yard to the pumphouse which may have been over two miles away. In later years an internal combustion motor was used and wherever possible, when it became available, electricity was used.
The steam engine required constant monitoring and would have required the pumper to remain at the pumphouse while in operation. With the arrival of the internal combustion engine the pumpers life became easier as constant monitoring was not required and at times the engine was provided with enough supplies of petrol or diesel so the engine ran out just as the tank was filled. Over a period of time the pumper became very adept at estimating the required running time for the engine. With the arrival of electricity the pump could be controlled remotely from the station thus negating the need for a pumper altogether.

Method of Supply

The general method of providing the water to the steam locomotives was to dam a watercourse, this being done by either a direct dam or an excavated tank beside the watercourse, if the river flow was sufficiently constant a dam was not required and the water was drawn directly from the river. A pump which was within a building called the pumphouse was used to draw the water from the dam, excavated tank or river and via a pipe transferred the water to an overhead tank beside the railway line. The tanks varied in size from 5,000 gallons (22,750 litres) to 80,000 gallons (364,000 litres) depending on the location and loco requirements. If required, the water was ‘softened’ using chemicals before it entered the tank. The water was stored within the tanks until required by a passing locomotive - a water column supplied by pipe from the tank or a jib on the tank was used to assist the loco crews to ‘water’ the locomotive.
This is an extreme high level view of water facilities from water supply to locomotive and there are many variations on this theme.

Classifications

Over the years the railways managed to have many different types of infrastructure relating to Watering Facilities. These can be grouped in to various types of Tanks, Stands, Columns, Jibs and Pumphouses. Of note there is no correlation between tanks and stands. ie: No particular type of tank was found on a certain type of stand.
The below method of classification is one that I have devised.

Tanks
Type 1: Buckled plate tank
These tanks take there name from the 5’ x 5’ x 3/16” steel plates, the centre of which is buckled outwards to provide rigidity. The bulge is square and protrudes approximately 3”. Adjoining plates are fastened to a flat bar positioned behind the join (resulting in vertical rows of bolts. Angle is used to join the corners and to brace the top edge of the tank. This type of tank is only one panel high.
Buckled plates (with the bulge upwards) were also used to form the floor of the tank. These were assembled in a similar manner to the sides so that the tank was supported by angle or T sections bolted underneath the joins in the floor plates. Buckled plate tanks could be found on stand made of either timber or steel. On timber stands cast iron shoes supported the tank to prevent it cutting into the supporting beams.

Type 2: Square Cornered Cast Tank
This type is characterised by rows of bolts along the bottom edge and down one side of each corner of the tank. Adjoining panels are bolted together through flanges on the inside edge of each panel. Bolts only pass through panels on corners. Apart from a rounded reinforcing rib cast on the top edge, the outer surface of the panels is flat. Their inner surface had ‘x’ shaped reinforcing

Type 2A: Square Cornered Cast Tank
This type is the same as Type 2 except that the interior of the panels did not have any bracing.

Type 3: Round Cornered Cast Tank, earlier style
These tanks are characterised by the use of curved corner pieces which allow all panels to be bolted together internally. They have a decorative trim on the outer face and have a cast ‘x’ shaped reinforcing on the inner face. This earlier style were built by various private companies and were built up to approximately 1915 although possibly as late a 1922.

Type 4: Round Cornered Cast Tank, later style
These tanks are virtually identical to the Type3 tanks except that all the panels were built by the Per Way Workshops in Newcastle from 1920.       

Stands

Type A: Wood
 16 x 12” x 12” piers sunk into brick pits with one level of cross bracing across full width of stand

Type A2:Wood
Similar to Type A except the piers are circular.

Type B: Wood
16 x 12” x 12” piers on timber horizontals with brick foundations. One level of bracing. 8.5” x 5.25” diagonal bracing. Bracing is entirely within verticals. Outside columns are braced only.

Type C: Wood
16 x 12” x 12” piers on concrete foundations. One level of bracing Diagonal bracing is external of piers and secured by long bolt where they cross.

Type D: Wood
Same as Type C but with two levels of bracing.

Type E: Steel
I beam piers. One Level of Bracing. Bracing does not have tension rings.

Type F: Steel
Same as Type E but with two levels of bracing. 

Type G: Steel
I beam pier. One level of Bracing. Bracing has tension rings

Type H: Steel
Same as Type G but with two levels of bracing

Type J: Steel/Concrete
Concrete arch Type structure approx 13’ high with steel structure for remaining height.

Type K: Steel/Concrete
Extended Concrete piers that are over 2’ above ground level

 Type L: Steel
Similar in Construction to Type G except bracing is steel angles rather than steel bars and is not joined where they cross.

Type M: Steel
Same as type L but with two levels of bracing

Type N: Brick
Stand is made from brick columns of varying heights dependant on the situation. Columns may be up to 15’ in height

Type 0: Brick
Stand is made of brick piers with full brick surrounds. One door provides access to the interior of the tank.

Columns

Type 1: Water flow controlled from valve at ground level
Type 2: Water flow controlled from ground level or from end of jib via gears. Valve at ground level controlled from outside column.
Type 3: Water flow controlled from end of jib. Valve within column.
Type 4: 12” column used in electrified areas. Jib able to swing below wires.
Type 4: Column with no jib.

Jibs

Type 1: Water flow controlled by screw valve at ground level.
Type 2: Water flow controlled by wire pull opening valve on end of jib.

Next episode - 1855 to 1892

Saturday, 31 December 2011

Bukalong Stockyards

Because of its distance from anything else most of the infrastructure of the Bombala line beyond Cooma survives today. Among the items left are the stockyards at Bukalong.
Bukalong is located at 519.524km and is the last station before the terminus at Bombala, a further 15 kilometres down the line. The station opened with the line on 21 November 1921 and closed as a station on 20 February 1975, one of the many stations in New South Wales that closed in 1975. The siding was offically closed on 23 November 1982 but more than likely saw little use post-1970. A PC1 type station building was provided on a 77 metre long platform.
A loop siding 349.5 metres long on the up side of the line was provided at opening. A down facing crossover approximately halfway down the loop was also provided - this was removed some years prior to the line's closure. The line closed on 26 March 1986.
In the later years of the line (1978 Timetable) the only train was No. 411 Conditional Freight that was tabled to run on Wednesday's and Friday's and was conditional on Tuesday's and Thursday's. The train departed Cooma at 7:30am (after the arrival of the overnight mail from Sydney) and arrived at Bombala at 11:20am. The return service departed Bombala at 1:30pm, arriving back at Cooma at 5:46pm.
The stockyards are located on the loop 331 feet from the up end points. The stockyard platform was 148 feet long.
The stockyards are predominately constructed of timber and protected from the elements by red lead paint - alot of which still survives.
The below picutres were taken in May 2012.